Materials: Project List
_ Project List: Materials

INTEC has provided materials, corrosion, welding and non destructive evaluation expertise on the following projects:
Project Name/Location Client Project Description Finish Date
Frade Field Development ChevronTexaco Materials specifications. Welding and NDE support Ongoing
Mardi Gras Deepwater Transportation Systems BP Developed new technologies for full scale collapse, and fatigue testing. Developed welding and NDE procedures Ongoing
Blind Faith Field Development Gulf of Mexico ChevronTexaco, BP Material specifications. Fatigue testing. Welding and NDE trials. ID boring of line pipe. Ongoing
Agbami Field Development Project Offshore Nigeria ChevronTexaco Materials selection. Corrosion management. Welding engineering. Subsea equipment selection. Ongoing
K2 Field Development Production Facilities Gulf of Mexico ENI Petroleum Materials selection. Corrosion management. Procurement and installation support. Bid reviews. 2004
Mutineer Exeter Subsea Development Clough Offshore Corrosion assessment. Materials selection. Procurement support. 2004
Algeria to Spain Gas Pipeline MEDGAZ consortium partners Front end engineering, design, pipeline design and preparing the EPIC bid packages.  2004
Ocean Express Pipeline AES Corporation Materials specifications including non-magnetic requirements for the line pipe (stainless steels). 2004
Olowi Project – Pipeline Feed Ocean Express Pipeline Sour service requirements for materials specifications. 2004
Independence Hub (MC920) Subsea Field Development Anadarko Petroleum Corporation Prepared tender documentation for all major components. Reviewed and pre-qualified vendor equipment for record depths. 2004
Green Canyon 518 Subsea Development Anadarko Pipe in pipe design. Fatigue testing. Materials and welding support. 2004
El Paso Marco Polo and Prince Field Development El Paso Energy Partners Detailed design of SCR’s. Materials specifications. Installation support 2003
Scarab / Saffron and Simian / Sienna Subsea Development Offshore Egypt Burrullus Gas Company Materials specifications. Procurement support. Subsea equipment supply. 2003
West Seno Phase II, Pipeline Design UNOCAL / Sea Engineering Prepared materials specifications. Performed ECA’s for all SCR’s . 2002
Gazprom Blue Stream Pipeline Project Southern Russia Gazprom Laboratory and field testing of coatings and sacrificial anodes. Sour service testing. Collapse testing. Welding trials including electron beam. 2002
Canyon Express Project Gulf of Mexico TotalFina Elf Materials specification preparation. Procurement support. Equipment qualification. Construction management. 2001
Mica and Marshall-Madison Flowline Project Gulf of Mexico ExxonMobil Development Company Materials selection. Corrosion management. NDE requirements. 2001
Horn Mountain Pipeline Gulf of Mexico BP, formerly VASTAR Resources Inc. Materials specifications. Fatigue testing. Cost estimates. 2001
PETROBRAS Guanabara By PE-3 Pipeline PETROBRAS Cathodic protection design using impressed current. Materials selection for relatively high temperatures. Upheaval buckling and fatigue issues resolved. 2001
Bonga Field Development Stolt Offshore Services Materials selection for water injection and gas export lines. Set up fatigue testing programs.  2001
Northstar Pipeline Project Alaskan Beaufort Sea coast BP Exploration, Alaska Arctic offshore and overland materials specifications. Full scale pipe bend test program. 1999
Diana Pipeline Project Gulf of Mexico Exxon Company Corrosion management. Fabrication and construction procedure reviews. Welding qualification program. 1999
Oman to India Pipeline Route Survey Oman Oil Company Laboratory and field testing sacrificial anodes. Welding and NDE trials. Collapse testing. 1998
King / King's Peak Pipeline Study Gulf of Mexico Heerema Marine Contractors Materials take offs and cost estimates. Developed method to control hi/lo. Pipe in pipe insulation material requirements 1998
Garden Banks 235 Subsea Louisiana Land and Exploration Company Materials and equipment specifications. Construction management. 1998
Mobile Bay Flowline Gulf of Mexico Exxon Company Specifying insulated pipe in pipe requirements. Field joint design. Materials, fabrication and installation specifications. 1997
Insulated Offshore Pipeline Study Chevron Petroleum Technology Company Study of non-jacketed and vacuum insulation systems for future use. 1995