Project Name/Location Client Project Description Finish Date
Oooguruk Offshore Field Development
Alaska
Beaufort Sea
Pioneer Natural Resources Pre-FEED, FEED and Detailed Design for development of Oooguruk field in 4 to 6 ft of water.  Scope includes concept selection, flow assurance, pipeline mechanical design, installation methods and trenching requirements. Ongoing
Arctic Pipeline Cost Estimating Tool Confidential Develop a cost estimating tool for offshore arctic pipelines in the Beaufort Sea, Barents Sea, Chukchi Sea, Kara Sea, Lapter Sea, East Siberian Sea, Arctic Islands, Labrador and Newfoundland Coasts, and offshore Sakhalin Island. Ongoing
Offshore Arctic Pipeline Technology Review Confidential Provide review of offshore arctic pipeline design and construction methods and techniques with an emphasis on construction, repair and leak detection.  Identify technology gaps and establish a work plan to address these gaps.  Assumes maximum 24-inch diameter pipeline in water depths less than 100 ft. 2006
Offshore Arctic Pipeline Cost Estimate
Canada
Beaufort Sea
Confidential Offshore arctic pipeline cost study-incorporating advancements in pipeline design and installation technology, along with current pricing strategies.  Purpose is to develop a methodology for defining costs and schedules for offshore arctic pipeline installation.  Addresses design basis and design concepts, flow assurance aspects, route selection and installation method evaluation, and costing and schedule. 2005
Zena Field Development Study
Russia, Barents Sea
Total E&P The Zena Field Development Study was a conceptual evaluation of the Shtockman Field to investigate subsea technologies suitable for ultra-long tie-back distances over 500 km.  The study investigated alternative issues with respect to flow assurance, subsea control, power supply, subsea separation and subsea compression (both downhole and on the mudline). The study evaluated the technical feasibility of these technologies and established that there were no fundamental barriers to the feasibility of this gas field. 2005
Nikaitchuq Offshore Field Development
Alaska
Beaufort Sea
Kerr-McGee Pre-FEED and FEED for development of Nikaitchuq field in 6 to 10 ft of water.  Scope includes concept selection, flow assurance, pipeline mechanical design, installation methods and trenching requirements. 2005
Shtokman Field Constructability Study
Russia
Barents Sea
Confidential Constructability study for 550 km long pipeline from Shtokman field to the Russian mainland with diameters up to 48-inch and water depths up to 375 meters. 2005
Exxon Neftegas Sakhalin I De-Kastri Loading Line Engineering John Brown Hydrocarbons Limited Exxon Neftegas Sakhalin I, Phase I Development, De-Kastri Oil Export Terminal 48-Inch Subsea Loading Line and Cable Engineering. Specialty engineering studies, including ice gouging, sediment transport, and vessel anchoring protection. Work includes managing other specialty subcontractors 2005
Sakhalin I
Sakhalin Island, Russia
ExxonMobil Feed level design of flowlines and pipelines, constructability review, schedule and cost estimate and preparation of ITT packages. 2005
BP Alaska Northstar Alaskan Beaufort Sea BP Exploration Alaska Engineering design, permitting assistance, and construction management assistance for twin 10- inch pipeline from Prudhoe Bay to Seal Island (approximately 6 miles offshore and 11 miles onshore). 2003
Timan-Pechora Export Terminal Feasibility Study Marathon Oil Company Technical feasibility, risk analysis, cost and schedule for crude oil export system in Western Siberia. 2003
Northern Gas Development Beaufort Sea ExxonMobil, BP Amoco, Phillips Petroleum 220-mile, 52-inch line from Pt. Thompson to Mackenzie Delta.  Preliminary design, construction plan development, preparation of cost estimate, and preparation of regulatory filing documents. 2002
BP Alaska Liberty Alaskan Beaufort Sea BP Exploration Alaska Conceptual evaluation and system design, and permitting assistance for a 12 inch pipeline from Liberty Island to landfall in Foggy Island Bay (approximately 6 miles). 2001
Grand Banks Area Field Development Study Grand Banks, Canada North Atlantic Pipeline Partners Undisclosed. 1999
400-Mile, 48 Inch Diameter Arctic Gas Line Screening Study Alaskan Beaufort Sea Undisclosed. Undisclosed. 1998
ARCO/Omelet Export Pipeline Feasibility Study Alaskan Beaufort Sea ARCO Alaska, Inc. Conceptual study of a crude oil transportation system between a proposed oil production island offshore Alaska and the existing Prudhoe Bay pipeline grid. 1998
Russian Arctic Cost Estimation Program Russian Arctic JIS/Exxon Venture (CIS), Inc./Shell International Development of a detailed onshore arctic pipeline installation cost estimating system specifically geared to northern Russia but also applicable to other regions. 1998
Northern Timan-Pechora Region Nearshore Transportation System Pechora Sea Conoco, Inc. Conceptual study of a crude oil export transportation system using a large diameter pipeline across the Pechora Sea to a tank farm and tanker loading facilities. 1996
Cost Estimation Program for Beaufort Sea Pipelines Beaufort Sea Exxon Production Research Company Development of an arctic pipeline installation program for the Beaufort Sea. 1994
Shtockman Field 42-inch Export Riser Conceptual Design Barents Sea Conoco, Inc. Carried out a study to investigate the options for a large diameter gas riser at a TLP type production platform. 1992
Timan-Pechora Development Marine Export System Pechora Sea Shell Internationale Petroleum Conducted an evaluation of the technical and economic feasibility of a marine crude oil export system for the Timan-Pechora region. 1992
Simpson Lagoon Pipeline Feasibility Study, North West Milne Point Alaskan Beaufort Sea Conoco, Inc. Investigation of the design, costs, and installation methods for pipelines and a power cable from offshore on the Alaskan North Slope to shore (approximately 3 miles). 1991
Timan-Pechora Development Facilities Feasibility Study Pechora Sea Texaco, Inc./ Ralph M. Parsons Considered various combinations of overland and submarine pipelines and tankers and loading terminals from the proposed Timan Pechora development to market. 1991
Timan-Pechora Pipeline Feasibility Study Pechora Sea Conoco, Inc. Prepared a conceptual design construction strategy and prepared project costs for a subsea oil pipeline connecting a gravity based export terminal to landfall in the Russian Arctic. 1991
Shtockman Field Offshore Pipelines Field Feasibility Barents Sea Wartsila Project Export & Finnish Barents Group Undertook technical and cost studies to determine the feasibility of constructing a pipeline from the Shtockman Field in the Barents Sea to markets in Western and Central Europe. 1990
Tie-In Method Evaluation for the Proposed Amauligak Caisson Retained Island Canadian Beaufort Sea Gulf Canada Resources, Inc. Evaluated technical merits, schedule factors and costs of various methods of pipeline approach to the CRI and recommended the most suitable methods. 1990
Arctic Subsea Pipeline Repair Study for Amauligak Canadian Beaufort Sea Gulf Canada Resources, Inc. Development of a route specific repair response plan for the Amauligak pipeline including repair techniques, vessels, and monitoring. 1989
Assessment of Installation and Trenching Scenario for Amauligak Canadian Beaufort Sea Gulf Canada Resources, Inc. Review and recommend a construction strategy for a 20-inch, 48 km long subsea oil pipeline connecting a caisson retained island structure in 31 m water depth to a landfall location. 1989
Subsea Completion and Tie-In Study of West Amauligak Reservoir Flowlines Canadian Beaufort Sea Gulf Canada Resources, Inc. Review of procedures, cost and schedule aspects related to the installation of a flowline bundle from the Amauligak CRI to a subsea well cluster. 1989
Arctic Development Consultation Union Texas Petroleum Company Retained to provide technical assistance for Arctic development evaluation. 1988
Chukchi Sea Pipeline Trenching Study Chukchi Sea Joint Industry Study Investigate new and existing dredging technology for Chukchi Sea applications with the overall goal of optimizing trenching performance and costs. 1988
Conceptual Designs, Costs, and Recommendations for Satellite Island Pipeline Approach Canadian Beaufort Sea Gulf Canada Resources, Inc. Generate concept designs, costs, and resulting recommendations for the pipeline approach to a satellite island. 1987
Chukchi Sea Transportation Feasibility and Cost Comparison Study Chukchi Sea Joint Industry Study Study of the feasibility and economics of transporting hydrocarbons from the Chukchi Sea area to shore by pipelines, oil tankers, ice breaking tankers or a combination. 1986
East Amauligak Subsea Pipeline Repair Study Canadian Beaufort Sea Gulf Canada Resources, Inc. Evaluation of damage, risk, and repair feasibility of a proposed Amauligak oil pipeline for the design, construction and operational phases. 1986
Evaluation of Potential Methods of Pipeline/Flowline Interface with Potential Production Structures Canadian Beaufort Sea Gulf Canada Resources, Inc. Identify technical advantages, disadvantages, costs, and installation schedules for potential methods of pipeline interface with proposed production structures. 1986
Amerada Hess North Star Island ? Construction Aspects of Pipelines Alaskan Beaufort Sea Ralph M. Parsons Specified and supervised route surveys, prepared a preliminary design, and identified feasible installation and trenching techniques for arctic oil and gas pipelines. 1986
Beaufort Sea Trenching and Pipe Protection Canadian Beaufort Sea Gulf Canada Resources, Inc. A study of design and installation aspects relating to trenching and pipe protection of an oil trunkline from East Amauligak to North point in the Canadian Beaufort Sea. 1985
Evaluation of Repair Methods for a Subsea Pipeline at Drew Point Alaska Alaskan Beaufort Sea Sohio Petroleum Company Evaluate arctic techniques for repairing offshore single phase oil pipeline in the Beaufort Sea and to provide a realistic appraisal of the present industry capability. 1985
Feasibility Study for Using Fibre Optic Sensor Cables on Marine Pipelines G-2 Consultants Study performed to evaluate the most favorable technique using a fiber optic sensor for strain monitoring of arctic marine pipelines. 1985
Study of Arctic Pipeline Construction in the Pechora and Kara Seas Pechora and Kara Seas Valmet Corporation Identify and evaluate methods for design and construction of pipelines in the arctic offshore regions of the Pechora and Kara Seas in water depths up to 150 meters. 1985
Technical Assistance for Beaufort Sea Development Canadian Beaufort Sea Gulf Canada Resources, Inc. Retained to provide technical assistance for Beaufort Sea development evaluation. 1985