Project Name Client Project Highlights Finish Date
Shell Lanka LPG TerminalSri Lanka Shell Terminal Lanka (Pvt) Ltd Design of a 4 point Conventional Buoy Mooring (CBM), PLEM and an associated 10-inch, 3.6 km offshore and 2.5 km onshore pipeline. 1999
Zafiro SPM TerminalEquatorial Guinea West Africa Mobil Equatorial Guinea Inc. (MEGI) Design and construction management of a crude oil export terminal located in 136 m water depth for 300,000 dwt tankers consisting of a Catenary Anchor Leg Mooring (CALM) type Single Point Mooring (SPM) system, and 3 km long 40-inch pipeline from an existing Floating Production Storage and Offloading (FPSO) system. 1999
ANCAP Del Este Marine TerminalUruguay ANCAP Feasibility study for upgrading an existing SPM terminal and associated tank farm facilities for import and export of crude oil and two other products, inclusive of study of ballast water contamination and disposal scenarios. The existing SPM for 150,000 dwt tankers is located 3.6 km offshore in 19 m water depth and connected to tank farm by a 36-inch pipeline. 1999
Coastal Dominican Republic CBM TerminalDominican Republic Coastal States Management Corp. Design of an LPG and diesel import terminal located in 26 m water depth for 30,000 dwt tankers consisting of a 6 point CBM system and 1 km long 8-inch (LPG) and 12-inch (diesel) pipelines. 1999
Cabot Port Dickson, CBM TerminalMalaysia CABOT (Malaysia) Sdn. Bhd. Design of a terminal located in 37 m water depth for 100,000 dwt tankers consisting of a 6 point CBM system and 9.3 km long 20-inch (crude oil import) and 10-inch (flushing/product export) pipelines and related onshore facilities. 1998
DSI Manavgat SPM TerminalManavgat, Turkey General Directorate of State Hydraulic Works (DSI) Design review and construction management of two fresh water export terminals located in 85 m water depth for 250,000 dwt tankers, consisting of CALM type SPM systems and dual 3 km long 48-inch pipelines to each SPM. 1998
MRC PSR-2 SPM TerminalMelaka, Malaysia Melaka Refining Company (MRC) Design and construction management of a crude oil import terminal located in 35 m water depth for 300,000 dwt tankers consisting of a CALM type SPM system and 7 km long 48-inch pipeline and related onshore facilities. 1998
Dabhol Power ProjectIndia Overseas Bechtel Inc. Design review and construction management of a fuel oil import terminal for 60,000 dwt tankers consisting of a CALM type SPM system and 8 km long 20-inch pipeline. 1998
Takoradi Thermal Power Station ProjectGhana Stone & Webster Inc. Construction management of a fuel oil import terminal for 55,000 dwt tankers consisting of a CALM type SPM system and 4 km long 24-inch pipeline. 1997
Balongan UP V1 Refinery Marine TerminalIndonesia Pertamina Design of an import/export terminal located in 24 m water depth consisting of a CALM type SPM system for 150,000 dwt tankers, a 36-inch crude oil pipeline and 24-inch flushing/ return pipeline, both 17.5 km long. 1997
Unocal Erawan SPM No. 2 TerminalThailand Unocal Thailand Ltd. Design and construction assistance of a CALM type SPM system condensate export terminal designed for permanent connection to an existing Floating Storage Unit (FSU) following FSU rehabilitation and upgrading. 1996
EcoElectrica Propane Import TerminalPuerto Rico Enron Engineering and Construction Company Technical evaluation of an existing jetty in Tallaboa Bay at the Commonwealth Oil Refining Company (CORCO) to determine if it could be refurbished as a propane import terminal for the new gas powered generating station. 1996
CPC Shalung SPM No. 2 TerminalTaiwan Chinese Petroleum Corp. (CPC) Design and construction management for replacement of a 5 km long 42-inch pipeline at an existing CALM type SPM system crude oil import terminal for 250,000 dwt tankers. 1995
Caleta Cordova SPM TerminalArgentina TERMAP SA Design of a new crude oil export terminal for 150,000 dwt tankers consisting of a CALM type SPM system, 4 km long 40-inch pipeline and refurbishment and upgrading of existing onshore storage facilities. 1995
Caleta Olivia SPM TerminalArgentina TERMAP SA Design of a new crude oil export terminal for 150,000 dwt tankers consisting of a CALM type SPM system, 3 km long 36-inch pipeline and refurbishment and upgrading of existing onshore storage facilities. 1995
Coastal Acajutla CBM TerminalEl Salvador Coastal Technology Design and construction management of a fuel oil import terminal for 60,000 dwt tankers consisting of a 7 point CBM system, and 2 km long 18-inch (fuel oil) and 12-inch (diesel) pipelines. 1995
Jamaica Energy Partners Power StationJamaica Wartsila Diesel, Inc. Design and construction of a heavy (No. 6) fuel oil import terminal for 35,000 dwt tankers consisting of a 5 point CBM system and dual 2 km long (looped) 14-inch pipelines. 1995
Star and Rayong SPM TerminalThailand Star Petroleum (Caltex) Design and construction management services for a crude oil import terminal for 280,000 dwt tankers consisting of a CALM type SPM system and 19 km long 48-inch pipeline to service both the Star (Caltex) and Rayong (Shell) Refineries. 1995
Pedernales Oil Export TerminalVenezuela BP Exploracion de Venezuela Feasibility study of a proposed crude oil export terminal for 40,000 dwt to 100,000 dwt tankers including CALM type SPM system and CBM terminal options, onshore storage and Floating Storage and Offloading (FSO) options, with associated pipelines from local fields. 1995
Safeport SPM TerminalTexas, USA Shiner, Moseley and Associates Feasibility review of a proposed crude oil import terminal for 150,000 dwt to 350,000 dwt tankers consisting of a CALM type SPM system and alternative large diameter pipeline options to Corpus Christi area refineries. 1994
CPC Shalung SPM No. 1 TerminalTaiwan Chinese Petroleum Corp. (CPC) Design and construction management of a 5 km long 20-inch gasoline pipeline and PLEM added to an existing CALM type SPM system crude oil import terminal. 1993
Honam Refinery CBM TerminalKorea Lucky Engineering Co. Ltd. Engineering study to upgrade an existing 4 point CBM system crude oil terminal from 20,000 dwt tankers to 40,000 dwt tankers. 1992
CPC Talinpu SPM No. 4 TerminalTaiwan Chinese Petroleum Corp. (CPC) Design and construction management of a diesel and naphtha import terminal for 150,000 dwt tankers consisting of a CALM type SPM and two 34-inch pipelines 6 km long. 1992
TMPLC Low Point SPM TerminalWashington, USA Trans Mountain Pipe Line Company Feasibility study of a proposed crude oil terminal for 150,000 dwt tanker consisting of an SPM in 45 to 60 m water depths and a 3 km long 48-inch pipeline to Seattle and Vancouver area refineries. 1992
Chevron CBM TerminalCalifornia, USA Chevron, USA Inc. Engineering design to relocate the pipeline and mooring system at an existing CBM terminal facility. 1992
Lasmo Cohasset/ Panuke Field DevelopmentNova Scotia, Canada Lasmo Nova Scotia, Ltd. Engineering and construct management of a CALM type SPM for mooring an 110,000 dwt FSO in 70 m water depth offshore Eastern Canada. 1992
CPC Talinpu SPM No. 3 TerminalTaiwan Chinese Petroleum Corp. (CPC) Design and construction management of a crude oil terminal for 300,000 dwt tankers, consisting of a CALM type SPM, one 56-inch (crude oil) and one 16-inch fuel) pipeline, each 8 km long. 1991
Amoco Terminal Simulation StudyBarents Sea, Norway Amoco Production Company Simulation study using proprietary terminal simulation for offshore oil export terminal for 125,000 dwt shuttle tankers, a CALM type SPM system to be located off the northern coast of Norway. 1988