INTEC is currently designing the flowlines and umbilical for a fast-track project to connect a single subsea well at the Mobil East Breaks Block 117 (570 ft water depth) to the existing East Breaks 160 (Cerveza) platform (935 ft water depth). Three miles of twin 4-inch ID flexible pipe and umbilical was installed during summer 1995.
INTEC's scope of work included trade-off studies, route selection, flowline detailed design, wellhead tie-in design, umbilical I-tube design, specifications, drawings, construction contract documents and interface coordination.
|