| Project Experience: System Operating Manuals
Subsea Production System Operating Guides
Starting from operating strategies and logics developed in the system design phases, detailed subsea production system operating guides are developed. SAFE Chart control requirements are incorporated into the automated and manual control sequences. Operations for well control, flowline, chemical injection, well shutdown and startup procedures are included. These guides define normal and emergency procedures to assure safe system operations. INTEC has prepared detailed operating guides for:
- LL&E Eugene Island (Direct Hydraulic)
- LL&E Garden Banks (Piloted Hydrulic)
- Mobil Zafiro, Phases I (Direct Hydraulic)
- Mobil Zafiro, Phase II (EH-MUX)
- Shell Mensa (EH-MUX)
- Shell Popeye (EH-MUX)
|