DMaC Tooling Systems
Flowline Pull-in Tool System
- Pull-In Tool (PIT)
An ROV controlled structural tooling package comprising two independent soft rope traction winches, docking probes and rope anchors, encompassing a pullhead docking and capture facility. Incorporated in the upper face of the tool is a guidance and docking facility with E/H control and communication connections for interfacing with the ROV via the Interface Skid.
Size (mm) 4100L x 2200W x 2000H
|
- Interface Skid
A structural tooling package secured to the base of a Workclass ROV supplying functional power and controls to the PIT via a connection stabplate, and to a Front Frame tooling package and Tool Deployment Unit.
Size (mm) 2830L x 1920W x 2000H
- Front Frame Assembly and Tool Deployment Unit
- Clamp make-up tool
- Low Torque Tool
- Medium Torque Tool
- Hot Stab Tool
- Seal plate Change-Out Tool
- HighTorqueTool
- Tool Deployment Basket
A protection frame structure, designed to overcome the buoyancy of the PIT, for safe deployment / recovery from deck to seabed, using the vessels crane. On the seabed the PIT is removed from and replaced back into the basket by the ROV.
- PC based Control System
A central control unit with page per tool display screen control including full diagnostic and maintenance pages. Located adjacent to the ROV pilots Control Console.
Note: ROV, Interface Skid and Pull-in Tool are all neutrally buoyant Subsea.
|
Umbilical Fly to Place Tool System
- FTP Tool
- Interface Skid (Common with Pull-in tool)
- PC Based Control System
- Support ROV
- Tooling Deployed with ROV
|
|